When the Power Goes, Does Your Business Close?
A business does not need a long outage to lose a day. A few minutes without power can shut the registers, drop the phones and card terminals, and leave a walk-in cooler warming behind a closed door. A standby generator with an automatic transfer switch keeps a business trading, but only for the loads it was designed to carry. This is how CITE Electric works through standby power for offices, restaurants, clubs and shops in Naples and across Collier and Lee County.

What an outage actually stops
Walk the building with one question: what stops when the lights go out? The list is usually longer than the owner expects.
- Sales. Point of sale stations and card readers, and the network they depend on. A terminal with its own battery still cannot take a card without the router, the switch and the internet connection.
- Phones and data. Internet phone systems, WiFi, servers and the cloud software staff use all day.
- Refrigeration. Walk-in coolers and freezers, reach-ins, ice machines and beverage coolers. Stock held out of temperature for too long has to be thrown away.
- Kitchens. In many commercial kitchens the gas cooking line is interlocked with the hood exhaust fan. With no power to the fan, the gas valve stays shut, so the line cannot cook even though gas is available.
- Lighting and access. General lighting, signs, door access and cameras.
- Life safety. Emergency lighting, exit signs and the fire alarm, which the code requires to keep working and which follow rules of their own.
Decide which loads matter
The NEC separates backup power into tiers, and the tiers shape the whole design. Emergency systems, such as egress lighting and exit signs in many occupancies, must pick up within a short time the code sets and are wired apart from everything else, on their own transfer switch. Legally required standby covers loads that a code or authority demands but that are not life safety. Optional standby is everything the business keeps running for its own reasons: refrigeration, registers, the network, the air conditioning.
Most decisions sit in that last tier, and they are business decisions. A restaurant may put the walk-ins, the hood fans, some kitchen lighting and the point of sale on the generator and leave the dining room air conditioning off. An office may want the server closet, the network, the phones and one floor of lighting. A club may want bar refrigeration, the kitchen and the front desk. We list the loads with you, put a measured or calculated figure against each, and draw the line where generator size and the business case meet.
Size it to the real load
A commercial generator chosen from floor area is a guess. We size from a load calculation of the loads you picked, built from the panel schedules, the equipment nameplates and, where the utility account records it, the peak demand on a year of bills. Where the panels already have circuit level metering, the readings replace estimates altogether.
Motors need special attention. Compressors, hood fans and pumps draw far more current starting than running, and a three phase building with several large motors can need more generator for starting than for running. A staggered start sequence and load shedding let a smaller unit carry more. Fuel matters too: natural gas where the building has a supply, or diesel from a tank on site, which then needs fuel management so it is usable on the day.
Automatic transfer, wired with the panels
An automatic transfer switch moves the chosen loads onto the generator when the utility drops and back when it returns, with or without staff on site. Commercial buildings often have more than one: one for the emergency loads, kept separate as the code requires, and one or more for the optional loads. Connecting them usually means regrouping circuits so the loads on backup sit together on their own panel. That is where an accurate panel schedule pays for itself.
Testing and maintenance keep it ready
A generator that has not run since commissioning is a risk, not a plan. Standby systems are exercised on a schedule, ideally under load, and emergency systems carry testing and record keeping requirements that inspectors and insurers check. Before handover we simulate a utility failure with the transfer switches operating and the loads picking up in order, so you watch it work rather than read that it should. From then on, maintenance covers the engine, its starting batteries, the fuel and the transfer switches.
Coordinating with the building and the utility
In a shared building, the landlord or association decides where a generator may go, how exhaust and noise are handled and whether a fuel supply can be extended. A roof location brings a structural review. A ground location brings setbacks, screening and sometimes the flood elevation. The connection to the service may need a shutdown arranged with the utility, FPL or LCEC depending on the address, scheduled outside trading hours. All of it is permitted and inspected, and CITE Electric carries the electrical work under its unlimited license, held by a master electrician.
Questions business owners ask
What size generator does a business need?
It depends on the loads you choose to keep running, worked out in a load calculation, not on the size of the building. The calculation is built from the panel schedules, the equipment on site and the demand history, with an allowance for the starting current of the largest motors.
Can a restaurant keep cooking on a generator?
Yes, if the hood exhaust fans and the gas line controls are on the generator. In many kitchens the gas valve is interlocked with the hood fan, so cooking stops in an outage unless both have backup power.
Does emergency lighting have to be on the generator?
Not always. Emergency lighting can run from battery units or from a generator through a separate emergency transfer switch, and the building, its occupancy and the code decide which. Either way it is tested and the results recorded.
How often should a commercial standby generator be tested?
A commercial standby generator should be exercised on a regular schedule, under load where possible, with every test recorded. Emergency systems have testing intervals set by code, and maintenance between tests covers the engine, its starting batteries, the fuel and the transfer switches.
Running a business in Naples that cannot afford to close in an outage? See our backup power service, or tell us about your building and we will start from the load calculation.
Talk to the people who will do the work.