At the drawing stage
We take the architectural set, mark up the lighting plan, the load plan and the device positions, and send it back.
Before the panel is ordered.
Home/Areas/Bonita Springs and Estero
Both towns are inside our Collier and Lee county service area. Most projects here are new builds that start on a drawing, so the electrical and the low voltage can be drawn together from the start.
What we hear
The wiring is priced before the systems are chosen.
On a new build the panel schedule is drawn long before anyone knows where the keypads go, so the systems arrive after the walls close and trim-out becomes a run of change orders. We draw the load calculation against the real fixture and device list, set the low voltage brackets at rough-in, and give every device a documented path back to the panel.
We take the architectural set, mark up the lighting plan, the load plan and the device positions, and send it back.
Before the panel is ordered.
Wall boxes, mounting brackets and cable runs set to the marked up plan and coordinated with the other trades.
Before the walls close.
Point to point testing against the panel schedule, commissioning in the finished room, and as-builts handed over with the building.
With the permit closed out.
We do not publish a project list by area. Most of our work is under a privacy agreement that keeps it off a website. Ask to see something comparable and we will arrange it directly.
Builders, general contractors and architects, on new construction and high-end remodels. A separate company under an unlimited license.
Homeowners and businesses, architects and interior designers, on new builds, remodels and commercial build-outs.
The property, the rooms and the systems you want. We reply within two business days.