For builders and GCs.

One electrical subcontractor who also holds the low voltage. Load calculation, panel schedule and rough-in drawn to the lighting plan, with the systems package drawn by the same team.

Looking up at ceiling framing before drywall, with six recessed light housings in two even rows of three and two round speaker brackets on the center line

The problem

The electrical is priced before anyone knows where the devices go.

The systems arrive after the walls close, so trim-out turns into a run of discoveries: no home run for a zone, no bracket for a keypad, a panel with no spare breaker spaces. Each one is a change order, and each one lands on your schedule. We draw the panel schedule against the real fixture and device list, set the low voltage brackets at rough-in, and both companies are under the same ownership, so there is nobody to hand the problem to.

Load calculation, panel schedule, rough-in drawing.

Load calculation

Calculated against the real fixture and device list for the building, including the systems that arrive later, rather than against a square footage rule.

Drawn before the panel is ordered.

Panel schedule

Every circuit named, addressed and recorded, with spare breaker spaces left for loads added later.

Handed over as a typed document with the as-builts.

Rough-in drawing

Home runs, mud rings, wiring cans and low voltage brackets set to the lighting plan and to the keypad and shade positions.

Coordinated with you and the other trades before the walls close.

How a job runs, drawing review to handover.

01

Drawing review

You send the set. We mark up the lighting plan, the load plan and the device positions.

02

Scope and price

A written scope and a price, not a ballpark.

03

Rough-in

Boxes, brackets and home runs set to the marked up plan before the walls close.

04

Panel build and trim

Load centers dressed, devices installed, circuits tested point to point against the panel schedule.

05

Commissioning and handover

Systems programmed in the finished room, then as-builts, panel schedules and device schedules handed over.

Send us the drawing set.

We reply within two business days.